arrangements with the surveyor for the payment for his services and those of his assistants in making the survey, as the United States will not be held responsible for the same.

128. A mineral surveyor is precluded from acting, either directly or indirectly, as attorney in mineral claims. His duty in any particular case ceases when he has executed the survey and returned the field notes and preliminary plat, with his report, to the surveyorgeneral. He will not be allowed to prepare for the mining claimant the papers in support of his application for patent, or otherwise perform the duties of an attorney before the land office in connection with a mining claim. He is not permitted to combine the duties of surveyor and notary public in the same case by administering oaths to the parties in interest, but as a notary public he may administer the oaths to his assistants in making the survey; otherwise he must have absolutely nothing to do with the case, except in his official capacity as surveyor. He will make no survey of a mineral claim in which he holds an interest, nor will he employ chainmen interested therein in any manner.

SURVEY-HOW MADE.

129. The survey made and returned must, in every case, be an actual survey on the ground in full detail, made by the mineral surveyor in person after the receipt of the order, and without reference to any knowledge he may have previously acquired by reason of having made the location survey or otherwise, and must show the actual facts existing at the time. This precludes him from calculating the connections to corners of the public survey and location monuments, or any other lines of his survey through prior surveys made by others and substituting the same for connections or lines of the survey returned by him. The term survey in this paragraph applies not only to the usual field work, but also to the examinations required for the preparation of affidavits of five hundred dollars expenditure, descriptive reports on placer claims, and all other reports.

130. The survey of a mining claim may consist of several contiguous locations, but such survey must, in conformity with statutory requirements, distinguish the several locations, and exhibit the boundaries of each. The survey will be given but one number.

131. The survey must be made in strict conformity with, or be embraced within, the lines of the location upon which the order is based. If the survey and location are identical, that fact must be clearly and distinctly stated in the field notes. If not identical, a bearing and distance must be given from each established corner of survey to the corresponding corner of the location, and the location corner must be fully described, so that it can be identified. The lines of the location, as found upon the ground, must be laid down upon the preliminary plat in such a manner as to contrast and show their relation to the lines of survey.

132. In view of the principle that courses and distances must give way when in conflict with fixed objects and monuments, the surveyor will not, under any circumstances, change the corners of the location for the purpose of making them conform to the description in the record. If the difference from the location be slight, it may be explained in the field notes.

133. No mining claim located subsequent to May 10, 1872, should

exceed the statutory limit in width on each side of the center of vein or 1,500 feet in length, and all surveys must close within 50-100 feet in 1,000 feet, and the error must not be such as to make the location exceed the statutory limit, and in absence of other proof the discovery point is held to be the center of the vein on the surface. The course and length of the vein should be marked upon the plat.

134. All mineral surveys must be made with a transit, provided with a solar attachment, by which the meridian can be determined independently of the magnetic needle, and all courses must be referred to the true meridian. The variation should be noted at each corner of the survey. The true course of at least one line of each survey must be ascertained by astronomical observations made at the time of the survey; the data for determining the same and details as to how these data were arrived at must be given. Or, in lieu of the foregoing the survey must be connected with some line the true course of which has been previously established beyond question, and in a similar manner, and, when such lines exist, it is desirable in all cases that they should be used as a proof of the accuracy of subsequent work.

135. Corner No. 1 of each location embraced in a survey must be connected by course and distance with nearest corner of the public survey or with a United States location monument, if the claim lies within two miles of such corner or monument. If both are within the required distance the connection must be with the corner of the public survey. 136. Surveys and connections of mineral claims may be made in suspended townships in the same manner as though the claims were upon unsurveyed land, except as hereinafter specified, by connecting them with independent mineral monuments. At the same time, the position of any public-land corner which may be found in the neighborhood of the claim should be noted, so that, in case of the release of the township from suspension, the position of the claim can be shown on the plat.

137. A mineral survey must not be returned with its connection made only with a corner of the public survey, where the survey of the township within which it is situated is under suspension, nor connected with a mineral monument alone, when situated within the limits of a township the regularity and correctness of the survey of which is unquestioned.

138. In making an official survey, corner No. 1 of each location must be established at the corner nearest the corner of the public survey or location monument, uniess good cause is shown for its being placed otherwise. If connections are given to both a corner of the public survey and location monument, corners Nos. 1 should be placed at the corner nearest the corner of the public survey. When a boundary line of a claim intersects a section line courses and distances from point of intersection to the Government corners at each end of the half mile of section line so intersected must be given.

139. In case a survey is situated in a district where there are no corners of the public survey and no monuments within the prescribed limits, a mineral monument must be established, in the location of which the greatest care must be exercised to insure permanency as to site and construction.

140. The site, when practicable, should be some prominent point, visible for a long distance from every direction, and should be so chosen

that the permanency of the monument will not be endangered by snow, rock, or landslides, or other natural causes.

141. The monument should consist of a stone not less than 30 inches long, 20 inches wide, and 6 inches thick, set halfway in the ground, with a conical mound of stone 4 feet high and 6 feet base alongside. The letters U. S. L. M., followed by the consecutive number of the monument in the district, must be plainly chiseled upon the stone. If impracticable to obtain a stone of required dimensions, then a post 8 feet long, 6 inches square, set 3 feet in the ground, scribed as for a stone monument, protected by a well-built conical mound of stone of not less than 3 feet high and 6 feet base around it, may be used. The exact point for connection must be indicated on the monument by an X chiseled thereon; if a post is used, then a tack must be driven into the post to indicate the point.

142. From the monument, connections by course and distance must be taken to two or three bearing trees or rocks, and to any well-known and permanent objects in the vicinity, such as the confluence of streams, prominent rocks, buildings, shafts, or mouths of adits. Bearing trees must be properly scribed B. T. and bearing rocks chiseled B. R., together with the number of the location monument; the exact point on the tree or stone to which the connection is taken should be indicated by a cross or other unmistakable mark. Bearings should also be taken to prominent mountain peaks, and the approximate distance and direction ascertained from the nearest town or mining camp. A detailed description of the locating monument, with a topographical map of its location, should be furnished the office of the surveyorgeneral by the surveyor.

143. Corners may consist of

First.-A stone at least 24 inches long set 12 inches in the ground, with a conical mound of stone 14 feet high, 2 feet base, alongside.

Second. A post at least 3 feet long by 4 inches square, set 18 inches in the ground and surrounded by a substantial mound of stone or earth.

Third.-A rock in place.

A stone should always be used for a corner when possible, and when so used the kind should be stated.

144. All corners must be established in a permanent and workmanlike manner, and the corner and survey number must be neatly chiseled or scribed on the sides facing the claim. The exact corner point must be permanently indicated on the corner. When a rock in place is used its dimensions above ground must be stated and a cross chiseled at the exact corner point.

145. In case the point for the corner be inaccessible or unsuitable a witness corner, which must be marked with the letters W. C. in addition to the corner and survey number, should be established. The witness corner should be located upon a line of the survey and as near as possible to the true corner, with which it must be connected by course and distance. The reason why it is impossible or impracticable to establish the true corner must always be stated in the field notes, and in running the next course it should be stated whether the start is made from the true place for corner or from witness corner.

146. The identity of all corners should be perpetuated by taking courses and distances to bearing trees, rocks, and other objects, as 6855-Vol. 31-01- -32

prescribed in the establishment of location monuments, and when no bearings are given it should be stated that no bearings are available. Permanent objects should be selected for bearings whenever possible.

147. If an official survey has been made within a reasonable distance in the vicinity, there should be a connecting line run to some corner of the same, and in like manner all conflicting surveys and claims should be so connected, and the corner with which the connection is made described. In survey of contiguous locations which are part of a consolidated claim, where corners are common, bearings should be mentioned but once.

148. The mineral surveyor should note carefully all topographical features of the claim, taking distances on his lines to intersections with all streams, gulches, ditches, ravines, mountain ridges, roads, trails, etc., with their widths, courses, aud other data that may be required to map them correctly. All municipal or private improvements, such as blocks, streets, and buildings, should be located."

149. If, in running the exterior lines of a claim, the survey is found to conflict with the survey of another claim, the distances to the points of intersection, and the courses and distances along the line intersected from an established corner of such conflicting claim to such points of intersection, should be described in the field notes: Provided, That where a corner of the conflicting survey falls within the claim being surveyed, such corner should be selected from which to give the bearing, otherwise the corner nearest the intersection should be taken. The same rule should govern in the survey of claims embracing two or more locations the lines of which intersect.

150. A lode and mill-site claim in one survey will be distinguished by the letters A and B following the number of the survey. The corners of the mill site will be numbered independently of those of the lode. Corner No. 1 of the mill site must be connected with a corner of the lode claim as well as with a corner of the public survey or United States location monument.

151. When a placer claim includes lodes, or when several contiguous placer or lode locations are included as one claim in one survey, there must be given to the corners of each location constituting the same a separate consecutive numerical designation, beginning with corner No. 1 in each case.

152. Throughout the description of the survey, after each reference to the lines or corners of a location, the name thereof must be given, and if unsurveyed, the fact stated. If reference is made to a location included in a prior official survey, the survey number must be given, followed by the name of the location. Corners should be described once only.

153. The total area of each location and also the area in conflict with each intersecting survey or claim should be stated; also the total area claimed. But when locations embraced in one survey conflict with each other such conflicts should only be stated in connection with the location from which the conflicting area is excluded.

154. It should be stated particularly whether the claim is upon surveyed or unsurveyed public lands, giving in the former case the quarter section, township, and range in which it is located, and the section lines should be indicated by full lines and the quarter-section lines by dotted lines.

[ocr errors]

155. The title-page of the field notes must contain the post-office address of the claimant or his authorized agent.

156. In the mineral surveyor's certificate of the value of the improvements all actual expenditures and mining improvements made by the claimant or his grantors, having a direct relation to the development of the claim, must be included in the estimate.

157. The expenditures required may be made from the surface or in running a tunnel, drifts, or crosscuts for the development of the claim. Improvements of any other character, such as buildings, machinery, or roadways, must be excluded from the estimate, unless it is shown clearly that they are associated with actual excavations, such as cuts, tunnels, shafts, etc., are essential to the practical development of, and actually facilitate the extraction of mineral from, the claim.

158. All mining and other improvements claimed will be located by courses and distances from corners of the survey, or from points on the center or side lines, specifying with particularity and detail the dimensions and character of each, and the improvements upon each location should be numbered consecutively, the point of discovery being always No. 1. Improvements made upon other locations, or by a former locator who has abandoned the claim, can not be included in the estimate, but should be described and located in the notes and plat.

159. In case of a lode and mill-site claim in the same survey the expenditure of five hundred dollars must be shown upon the lode claim. 160. If the value of the labor and improvements upon a mineral claim is less than five hundred dollars at the time of survey, the mineral surveyor may file with the surveyor-general supplemental proof showing five hundred dollars expenditure made prior to the expiration of the period of publication.

161. The mineral surveyor will return with his field notes a preliminary plat on blank sent to him for that purpose, protracted on a scale of two hundred feet to an inch, if practicable. In preparing plats the top is north. Copy of the calculations of areas by double meridian distances and of all triangulations or traverse lines must be furnished. The lines of the claim surveyed should be heavier than the lines of conflicting claims.

162. Whenever a survey has been reported in error the surveyor who made it will be required to promptly make a thorough examination upon the premises and report the result, under oath, to the surveyor-general's office. In case he finds his survey in error he will report in detail all discrepancies with the original survey and submit any explanation he may have to offer as to the cause. If, on the contrary, he should report his survey correct, a joint survey will be ordered to settle the differences with the surveyor who reported the error. A joint survey must be made within ten days after the date of order unless satisfactory reasons are submitted, under oath, for a postponement. The field work must in every sense of the term be a joint and not a separate survey, and the observations and measurements taken with the same instrument and chain, previously tested and agreed

upon.

163. The surveyor found in error, or, if both are in error, the one who reported the same, will make out the field notes of the joint survey, which, after being duly signed and sworn to by both parties, must be transmitted to the surveyor-general's office.

« PreviousContinue »