... scaffolds from which men work . When buildings are being cleaned down from scaffolds , hazards may be decreased by keeping the fall line on the outside of the scaffold , with the free end coiled in a box or barrel 7 ft away from the ...
... scaffolds from which men work . When buildings are being cleaned down from scaffolds , hazards may be decreased by keeping the fall line on the outside of the scaffold , with the free end coiled in a box or barrel 7 ft away from the ...
Page 240
... scaffold during storm or high wind . Clean the scaffold daily of all rubbish , and do not allow tools , buckets , etc. , to be left on the scaffold when workmen leave . In winter remove snow and ice from scaffolds before starting work ...
... scaffold during storm or high wind . Clean the scaffold daily of all rubbish , and do not allow tools , buckets , etc. , to be left on the scaffold when workmen leave . In winter remove snow and ice from scaffolds before starting work ...
Page 241
... scaffold , and great care should be taken to keep the plat- form level . It is very important on suspended scaffolds to have the guardrails , toeboards , overhead roof , and other protection in good condition . All parts of suspended ...
... scaffold , and great care should be taken to keep the plat- form level . It is very important on suspended scaffolds to have the guardrails , toeboards , overhead roof , and other protection in good condition . All parts of suspended ...
Contents
Construction Scheduling | 1 |
Purchasing | 119 |
Materials Expediting and Transportation | 145 |
Copyright | |
8 other sections not shown
Common terms and phrases
agreement apply approval arbitration Architect ARTICLE Associated General Contractors bar chart bill of lading bill of material bolt building cable carrier charges chart completion concrete conehead consignee construction contract contractor copy cost covered damage Deatherage delivery demurrage drawings and specifications employee employment engineering equipment erection estimate foreman freight furnish handling inspection issued labor liability load manager ment method necessary operation organization owner party payment performed person pipe pipe Wrenches plans procedure Punches purchase order purchasing agent rates Reamers received record rental requisition rope safety safety engineer scaffolds schedule secured sheet shipment shipper standard steel erector structural steel subcontractor superintendent supply taper shank Drill temporary terials thereof tion Toledo tractor trucks unloading VALVE vendor wages wire Wrenches