Construction Scheduling and ControlMcGraw-Hill, 1965 - 316 pages |
From inside the book
Results 1-3 of 96
Page 3
... SCHEDULE ESTIMATED TIME SCHEDULE SHOWN. ( analysis to determine the most economical one and to arrive at working and calendar days to complete . Those are the activity times as re- quired by a CPM network . • Preparation of a preliminary ...
... SCHEDULE ESTIMATED TIME SCHEDULE SHOWN. ( analysis to determine the most economical one and to arrive at working and calendar days to complete . Those are the activity times as re- quired by a CPM network . • Preparation of a preliminary ...
Page 45
... schedule takes shape . A step - by - step manual method allows the planner to retain more judgment control in making change in the input data . It also permits him to pick a starting point that limits the range over which approximations ...
... schedule takes shape . A step - by - step manual method allows the planner to retain more judgment control in making change in the input data . It also permits him to pick a starting point that limits the range over which approximations ...
Page 287
... schedule . As soon as data has been posted on job schedule , the weekly labor cost report will be turned over by Mr. Ebert to Miss Jones for typing . This report is to be ready to start typing at 9:00 A.M. and be completed for ...
... schedule . As soon as data has been posted on job schedule , the weekly labor cost report will be turned over by Mr. Ebert to Miss Jones for typing . This report is to be ready to start typing at 9:00 A.M. and be completed for ...
Contents
Construction Scheduling | 1 |
Purchasing | 119 |
Materials Expediting and Transportation | 145 |
Copyright | |
8 other sections not shown
Common terms and phrases
agreement apply approval arbitration Architect ARTICLE Associated General Contractors bar chart bill of lading bill of material bolt building cable carrier charges chart completion concrete conehead consignee construction contract contractor copy cost covered damage Deatherage delivery demurrage drawings and specifications employee employment engineering equipment erection estimate foreman freight furnish handling inspection issued labor liability load manager ment method necessary operation organization owner party payment performed person pipe pipe Wrenches plans procedure Punches purchase order purchasing agent rates Reamers received record rental requisition rope safety safety engineer scaffolds schedule secured sheet shipment shipper standard steel erector structural steel subcontractor superintendent supply taper shank Drill temporary terials thereof tion Toledo tractor trucks unloading VALVE vendor wages wire Wrenches