Page 114
The following for steel erection may be taken as typical : STRUCTURAL STEEL ERECTION SPECIFICATIONS SCOPE OF WORK : The party performing the work under this heading , hereinafter referred to as the structural steel erector , shall ...
The following for steel erection may be taken as typical : STRUCTURAL STEEL ERECTION SPECIFICATIONS SCOPE OF WORK : The party performing the work under this heading , hereinafter referred to as the structural steel erector , shall ...
Page 115
FIELD ing and drilling required for proper connection of structural steel to existing structure , as detailed by the fabricator or as otherwise indicated on the drawings . PAINTING : All structural steel , unless otherwise specified ...
FIELD ing and drilling required for proper connection of structural steel to existing structure , as detailed by the fabricator or as otherwise indicated on the drawings . PAINTING : All structural steel , unless otherwise specified ...
Page 231
Such life lines shall be fastened to the building or other structure to which the scaffold is attached , independently of the scaffolding , and shall have a safety factor of at least 3 . Temporary Footways . Whenever a temporary fence ...
Such life lines shall be fastened to the building or other structure to which the scaffold is attached , independently of the scaffolding , and shall have a safety factor of at least 3 . Temporary Footways . Whenever a temporary fence ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Common terms and phrases
activities agent agreed agreement amount apply approval Architect authority bill Blocks building carrier cause changes charges claims completion connection construction contract contractor copy cost covered damage delivery determined direct drawings Drill employee engineering equipment estimate field functions furnish given handling industry inspection issued labor laws less load loss maintain manager materials ment method necessary operation organization owner paid party payment performed person pipe plans possible practice prepared procedure progress proper purchase rates reasonable received record relations requisition responsible safety scaffolds schedule secured sheet ship shipment signed specifications standard starting steel structure subcontractor supply temporary thereof tion unit usually vendor wages Wrenches written