Page 45
... adopted for dredging an area in the vicinity of the steamboat wharf in the outer harbor to 14 feet at mean low tide . This work was completed in 1903. The cost was $ 7,459.21 . The total expenditures on Camden Harbor during above period ...
... adopted for dredging an area in the vicinity of the steamboat wharf in the outer harbor to 14 feet at mean low tide . This work was completed in 1903. The cost was $ 7,459.21 . The total expenditures on Camden Harbor during above period ...
Page 74
... Adopted by the river and harbor act of July 13 , 1892 : To widen the main ship channel , from Nantasket Roads to Boston , 83 miles , to 1,000 feet , and to deepen it to 27 feet at mean low water , at an estimated cost of $ 1,250,000 ...
... Adopted by the river and harbor act of July 13 , 1892 : To widen the main ship channel , from Nantasket Roads to Boston , 83 miles , to 1,000 feet , and to deepen it to 27 feet at mean low water , at an estimated cost of $ 1,250,000 ...
Page 468
... adopted in the river and harbor act of September 19 , 1890. The project adopted at that time provided for securing a channel 6 feet deep at low water between the mouth and Demopolis by the construction of locks and dams and bank ...
... adopted in the river and harbor act of September 19 , 1890. The project adopted at that time provided for securing a channel 6 feet deep at low water between the mouth and Demopolis by the construction of locks and dams and bank ...
Other editions - View all
Common terms and phrases
100 feet wide 12 feet act approved June act of June act of March Amount appropriated Amount estimated amount expended Annual Report Appendix appropriated by river approved June 25 balance unexpended July balance unexpended__ Bayou breakwater bridge canal Chief of Engineers commerce completion of existing compliance with requirements Creek cubic yards dredging ending June 30 estimated cost examination and survey existing project expended during fiscal expenditure in fiscal feet at mean feet deep fiscal year ending freight rates harbor act approved head of navigation House Document jetty June 13 Lake locks and dams lumber maintenance of improvement maximum draft mean low water miles Mississippi River mouth obstructions original project outstanding liabilities piers Preliminary examination present project printed in House removal reports on examinations required for completion required for expenditure requirements of sundry river and harbor second session shoals short tons Sixty-first Congress Submitted in compliance sundry civil act width