Report of the Chief of Engineers, U.S. Army, Part 1U.S. Government Printing Office, 1910 |
From inside the book
Results 1-3 of 92
Page 8
... feet wide , equivalent to about 126 acres , in which there was a depth of 30 feet at mean low water . Between 1901 and 1910 , inclusive , dredging in addition to that previously stated was done in various places in Boston harbor and its ...
... feet wide , equivalent to about 126 acres , in which there was a depth of 30 feet at mean low water . Between 1901 and 1910 , inclusive , dredging in addition to that previously stated was done in various places in Boston harbor and its ...
Page 98
... feet , mean low water , off the Battery ; Coenties Reef , 14.3 feet , mean low water , off Coenties Slip ; Shell Reef , 9 feet , mean low water , between Eighth and Tenth streets ; Ferry Reef , 7 feet , mean low water , and Charlotte ...
... feet , mean low water , off the Battery ; Coenties Reef , 14.3 feet , mean low water , off Coenties Slip ; Shell Reef , 9 feet , mean low water , between Eighth and Tenth streets ; Ferry Reef , 7 feet , mean low water , and Charlotte ...
Page 146
... feet long and 57 feet wide ; the Wapping Dry Dock or Corpora- tion Commercial Dry Dock , owned by the Bristol Corporation , 319 feet long and 48 feet wide ; Charles Hill and Son's Albion Dock , 540 feet long and 52 feet wide . Outside ...
... feet long and 57 feet wide ; the Wapping Dry Dock or Corpora- tion Commercial Dry Dock , owned by the Bristol Corporation , 319 feet long and 48 feet wide ; Charles Hill and Son's Albion Dock , 540 feet long and 52 feet wide . Outside ...
Other editions - View all
Common terms and phrases
100 feet wide 12 feet act approved June act of June act of March Amount appropriated Amount estimated amount expended Annual Report Appendix appropriated by river approved June 25 balance unexpended July balance unexpended__ Bayou breakwater bridge canal Chief of Engineers commerce completion of existing compliance with requirements Creek cubic yards dredging ending June 30 estimated cost examination and survey existing project expended during fiscal expenditure in fiscal feet at mean feet deep fiscal year ending freight rates harbor act approved head of navigation House Document jetty June 13 Lake locks and dams lumber maintenance of improvement maximum draft mean low water miles Mississippi River mouth obstructions original project outstanding liabilities piers Preliminary examination present project printed in House removal reports on examinations required for completion required for expenditure requirements of sundry river and harbor second session shoals short tons Sixty-first Congress Submitted in compliance sundry civil act width