| Sandford Fleming, Canada. Department of Public Works - 1877 - 474 pages
...track, it must be made sufficiently solid to prevent bending the rails, or twisting the rail-joints. After the lift, the track shall be centred, lined,...surfaced and trimmed off' to a proper form and width. 83. In the event of full ballasting being required, a second " lift" must be made, in the same manner... | |
| Canada. Department of Railways and Canals, Sandford Fleming - 1880 - 426 pages
...track, it must be made sufficiently solid to prevent bending the rails, or twisting the rail-joints. After the lift, the track shall be centred, lined,...surfaced and trimmed off to a proper form and width. Full ballast. 86. In the event of full ballasting boing required, a second "lift" must be made, in... | |
| Canada. Royal commission to investigate charges against Sir A.P. Caron - 1893 - 626 pages
...track, it must be made sufficiently solid to prevent bending the rails or twisting the rail-joints. After the lift, the track shall be centred, lined,...surfaced and trimmed off to a proper form and width. 7th. In wet cuttings or where the foundations are too much affected by frost or water, the engineer... | |
| Ontario. Legislative Assembly - 1905 - 840 pages
...prevent bending the rails or twisting the rail joints. After the lift the track shall be centered, lined, topped, surfaced and trimmed off to a proper...lift must be made in the same manner and with the same precautions as required for the first lift, in order to secure a uniforrii thickness of 10 inches... | |
| |