MANILA, CITY OF-Continued. Precincts, reports of various: 196-198. Saloons, restaurants, hotels, barber shops, etc., number of: 196-198. Personnel: 192. Present strength: 192. Property division: 202. Schools: 192. Service pay: 193. Uniform, change of: 203. Educational work in: 65. Expenditures: 53, 54, 55, 57, 86. Health of: 66. Increase pay based on length of service of lieutenants and sergeants: 64. MANILA, CITY OF-Continued. Sewerage system-Continued. Report engineer in charge-Continued. By districts: 158. Future growth: 159. Population, present and estimated by districts: 178. Septic tank: 161. Sewerage collections, general designs for: 165, 166. Supplementary report: 185, 186. Comments on suggestions of consulting engineer: 185, 186. Velocity and discharge of sewers: 177. Report of consulting engineer on: 178, 185. Conditions existing: 178, 179. Flushing: 184. Forms and grades: 184. Manholes and sewer ventilation; 184. Outline of Mr. Ingall's plan: 179–185. Float observations: 180, 181. Plumbing, house connections and: 184, 185. Recommendations, general: 185. System employed in Boston: 181, 182. Sheriff's fees-- Revenue from: 52, 56, 223. Sheriff, office of- Collection and disposal of refuse; report of superintendent of: 121-126. Cemeteries: 125. Cleaning esteros: 126. Collection and disposal of garbage, refuse, and dead animals: 121, 122. Land transportation: 125. Equipment and employees: 125. Night soil, removal of: 124. Equipment for disposal of: 124. Pails cleaned, number of: 123, 124. Amount collected for: 123. Parks: 125. Street cleaning: 121. Street sprinkling: 121. Vaults cleaned and loads removed: 123. Amount collected for: 123. Progress made in: 59. Street construction and bridges, report of superintendent of: 112-121. Bridges: 119. Inspection and repair of: 119, 120. Cement gutters: 115. City wall, removal of: 115. Curbing, cement: 117. Extension, widening and improvement of, disbursements for: 89. Value of land to be purchased for: 63, 64. Property holders, action of: 63. Widening of, committee appointed for consideration of plans for: 63. Water and sewer improvements- Amount authorized for: 57. Water rates- Revenue from: 53, 56. Water service-- Bonds for construction of: 63. Disbursements for survey of: 87. Expenditure for extension and improvement of: 56. Plans and surveys of, work on: 62. Report of consulting engineer on: 62. Source of revenue, ratio: 54. Water supply and sewers, report of superintendent: 126-136. Estimated cost: 130. New work: 129. Cost: 131. Repairs and cleaning: 129. Cost: 132, 133. MANILA, CITY OF-Continued. Water supply and sewers--Continued. Rainfall data, 1887-1903: 129. New fire hydrants: 135. New yard: 135. Repair shops: 135. Storm water-drainage system: 126-128. Basis of computations and designs: 128. Determination of minimum elevation of outfalls: 126. Drainage for the district of Santa Cruz: 128. General observations: 126. Intensities of rainfall and run-off: 127. Method of conducting the work: 128. Prevention of deposit: 127. Street grades and drainage areas: 127. Variation in estero levels and estero currents: 127. Water supply: 133. City distribution: 134. Repairs: 134. Constructions: 134. Determination of the time and rate of maximum hourly consump- tion: 135. El Deposito: 133. Extension of new distribution system: 134. Fire-hydrant system: 134. Installation and repairs: 134. Pumping station: 133. Santolan: 134. Water supply, report of consulting engineer upon proposed new: 149–154. Future requirements: 150. Observations of Maj. J. F. Case, city engineer: 156, 157. Physical aspects of the proposed works: 153. Dam: 153. Steel-pipe line: 153. Present supply: 149, 150. Bequest of Francisco Carriédo y Peredo: 149. Quality of water: 152. Rainfall and storage: 151. Recommendations of Maj. James F. Case: 150. Report of superintendent of Government laboratories on examination of Cost of: 39. MANILA, PORT OF: Committee to examine bulkhead or retaining wall, recommend additional reen- |