Page images
PDF
EPUB

MANILA, CITY OF-Continued.
Police department-Continued.
Chief of, report of-Continued.
Mounted detachment: 195.
Office building, change of: 204.
Office force: 203.

Precincts, reports of various: 196-198.

Saloons, restaurants, hotels, barber shops, etc., number of: 196-198.

Personnel: 192.

Present strength: 192.

Property division: 202.

Schools: 192.

Service pay: 193.

Uniform, change of: 203.

Educational work in: 65.

Expenditures: 53, 54, 55, 57, 86.

Health of: 66.

Increase pay based on length of service of lieutenants and sergeants: 64.
Installation of fire pump on police launch Bucky O'Neill: 65.

[blocks in formation]
[blocks in formation]

MANILA, CITY OF-Continued.

Sewerage system-Continued.

Report engineer in charge-Continued.
Object to be obtained: 159.
Outfall pipe: 167.
Population: 158, 159.

By districts: 158.
Density: 159.

Future growth: 159.

Population, present and estimated by districts: 178.
Recommendations: 163.

Septic tank: 161.

Sewerage collections, general designs for: 165, 166.
Size and length of sewers by districts: 177.

Supplementary report: 185, 186.

Comments on suggestions of consulting engineer: 185, 186.

Velocity and discharge of sewers: 177.

Report of consulting engineer on: 178, 185.

Conditions existing: 178, 179.

Flushing: 184.

Forms and grades: 184.

Manholes and sewer ventilation; 184.

Outline of Mr. Ingall's plan: 179–185.

Float observations: 180, 181.
Outlets: 180-182.

Plumbing, house connections and: 184, 185.
Pumping station: 184.

Recommendations, general: 185.
Sizes of sewers: 183.

System employed in Boston: 181, 182.

Sheriff's fees--

Revenue from: 52, 56, 223.

Sheriff, office of-

[blocks in formation]

Collection and disposal of refuse; report of superintendent of: 121-126.

Cemeteries: 125.

Cleaning esteros: 126.

Collection and disposal of garbage, refuse, and dead animals: 121, 122.
Collection and disposal of night soil: 122.

Land transportation: 125.

Equipment and employees: 125.

Night soil, removal of: 124.

Equipment for disposal of: 124.

Pails cleaned, number of: 123, 124.

Amount collected for: 123.

Parks: 125.

Street cleaning: 121.

Street sprinkling: 121.

Vaults cleaned and loads removed: 123.

Amount collected for: 123.

Progress made in: 59.

Street construction and bridges, report of superintendent of: 112-121.

Bridges: 119.

Inspection and repair of: 119, 120.

Cement gutters: 115.

City wall, removal of: 115.

Curbing, cement: 117.

[blocks in formation]

Extension, widening and improvement of, disbursements for: 89.
Improvement of: 63, 64.

Value of land to be purchased for: 63, 64.

Property holders, action of: 63.

Widening of, committee appointed for consideration of plans for: 63.
Taxes. (See MANILA, CITY OF, ASSESSOR AND COLLECTOR.)

[blocks in formation]

Water and sewer improvements-

Amount authorized for: 57.

Water rates-

Revenue from: 53, 56.

Water service--

Bonds for construction of: 63.

Disbursements for survey of: 87.

Expenditure for extension and improvement of: 56.

Plans and surveys of, work on: 62.

Report of consulting engineer on: 62.

Source of revenue, ratio: 54.

Water supply and sewers, report of superintendent: 126-136.
Construction and repair of sewer and drains: 129.

Estimated cost: 130.

New work: 129.

Cost: 131.

Repairs and cleaning: 129.

Cost: 132, 133.

MANILA, CITY OF-Continued.

Water supply and sewers--Continued.
Labor: 136.

Rainfall data, 1887-1903: 129.
Recommendations: 135.

New fire hydrants: 135.

New yard: 135.

Repair shops: 135.

Storm water-drainage system: 126-128.

Basis of computations and designs: 128.

Determination of minimum elevation of outfalls: 126.

Drainage for the district of Santa Cruz: 128.

General observations: 126.

Intensities of rainfall and run-off: 127.

Method of conducting the work: 128.

Prevention of deposit: 127.

Street grades and drainage areas: 127.

Variation in estero levels and estero currents: 127.

Water supply: 133.

City distribution: 134.

Repairs: 134.

Constructions: 134.

Determination of the time and rate of maximum hourly consump-

tion: 135.

El Deposito: 133.

Extension of new distribution system: 134.

Fire-hydrant system: 134.

Installation and repairs: 134.

Pumping station: 133.

Santolan: 134.

Water supply, report of consulting engineer upon proposed new: 149–154.
Distributing reservoir: 153, 154.

Future requirements: 150.

Observations of Maj. J. F. Case, city engineer: 156, 157.

Physical aspects of the proposed works: 153.

Dam: 153.

Steel-pipe line: 153.

Present supply: 149, 150.

Bequest of Francisco Carriédo y Peredo: 149.

Quality of water: 152.

Rainfall and storage: 151.

Recommendations of Maj. James F. Case: 150.

Report of superintendent of Government laboratories on examination of

[blocks in formation]

Cost of: 39.

MANILA, PORT OF:

Committee to examine bulkhead or retaining wall, recommend additional reen-
forcement and cost of same; also character and kind of wharf needed and esti-
mate cost: 696.

« PreviousContinue »