... necessary permission was obtained from the United States and Canadian governments , and on May 7 , 1927 , the actual work of construction commenced . The total length of the bridge , including the main span , the approaches , and ...
... necessary permission was obtained from the United States and Canadian governments , and on May 7 , 1927 , the actual work of construction commenced . The total length of the bridge , including the main span , the approaches , and ...
Page 21
... necessary insurance for idle equipment during all the other years in order to protect against this possible but rare occurrence . System capacity is usually computed with at least one large unit in reserve . Plant capacities have some ...
... necessary insurance for idle equipment during all the other years in order to protect against this possible but rare occurrence . System capacity is usually computed with at least one large unit in reserve . Plant capacities have some ...
Page 24
... necessary the use of steel girders instead of timber for the saddle beam and bal- ance beam . The saddle beam is a 26 - inch Bethlehem 1-91.0 lb. anchored at both ends . The anchorage used was pig iron loaned for. Fig . 4 TESTING ...
... necessary the use of steel girders instead of timber for the saddle beam and bal- ance beam . The saddle beam is a 26 - inch Bethlehem 1-91.0 lb. anchored at both ends . The anchorage used was pig iron loaned for. Fig . 4 TESTING ...
Page 27
... necessary to cause movement . In addition to this the 100 - ton jack was calibrated in a testing machine at the University to determine the force on the ratchet bar necessary to raise a given load . thright en rothat four in los 35 ยท 30 ...
... necessary to cause movement . In addition to this the 100 - ton jack was calibrated in a testing machine at the University to determine the force on the ratchet bar necessary to raise a given load . thright en rothat four in los 35 ยท 30 ...
Page 28
... necessary for all of the laboratory work . Two methods of taking soil samples were used . An 14 - inch pipe sharpened on one end was used for taking core samples from the elevation of the bottom of the pit to a depth of from 3 to 6 feet ...
... necessary for all of the laboratory work . Two methods of taking soil samples were used . An 14 - inch pipe sharpened on one end was used for taking core samples from the elevation of the bottom of the pit to a depth of from 3 to 6 feet ...
Other editions - View all
Common terms and phrases
Ambassador Bridge Ann Arbor apparatus application applied load balance beam bearing capacity bearing plate Bearing Value Bldg blue clay bridge building cent center thickness civil engineer coal cohesive strength compression post concrete 20 ft confining influence construction CONTRACTORS curves DEFLECTION IN INCHES Detroit Dixie highway economic Eight Mile road engineer or surveyor Engineers and Surveyors equipment examination failure fixed charges fluidity Grand Rapids hopper box hydro plant increase jack KELLER TRACTOR Lake road lateral pressure LOAD DEFLECTION load factor material measurements Michigan Engineering Society Mile road mill powers nine square feet Oakland County open pit operation PAVING perimeter person Phone pin joint pipe caps practice present pressure bulb registered architect road extends ROUND PLATE RULE saddle beam Section SEWER shear soil square foot SQUARE PLATES steam plants steel straight edge structure term expires June tests unit load utility water power yellow clay