TABLE II.-Report of operations of pipe-line hydraulic dredges for the fiscal year ending June 30, 1911-Continued. Gamma. Geyser. Harrod, B. M. Hecla. TOWBOATS AND LAUNCHES-continued. launches. Extraordinary repairs to towboats and Extraordimary repairs to barges. 250 pounds coal in 24 hours. 350 pounds coal in 24 hours.. $0.043. $12,833.30 1,225 tons. 158 gallons gasoline (launch)... $1.90 to $2.69 per gallon.. 1 Includes cost of Geyser outfit and 8 pontoons. $17,484. 12 Average depth. $0.0744. 1,566 tons. $2.23 to $2.29 per ton. Remarks. No towboat or launch with the cost of outfit. * Building 10 new pontoons. Locality. Miles below Cairo. Locality. Before After dredg- dredg Miles below Caiго. ing. ing. 2 No towboat attached to Gey Before After dredg- dredg-| ing. ing. ser here. Feet. Feet. Feet. Fect. Fritz. 101 11.0 Medleys... 31 8 13 Bullerton.. 167 9.0 10.0 Upper Island 35. 194 9.0 11.0 Point Walts. 201 8.5 12.5 Pleasant. 80 West Lower Memphis Point (testing tion Pleasant 81 9 13 new suc head).... 232 Island No. 14... 99 14 11 Name Name. TABLE II.-Report of operations of pipe-line hydraulic dredges for the fiscal year ending June 30, 1911-Continued. Howell, Capt. C. W. Humphreys, Chas. Indiana. Iota. Number, size, and type of propelling en gines. Number, size, and type of pumping en gines. Boilers: Number and type.. Length. 1904. 1907-8. Texas City, Tex. Mobile, Ala. U.S. Engineer Department.. United States. 6 months.. Wood... $40,000 (includes cost of outfit as snag boat). Heating surface (total). Grate surface (total). Diameter. WORK PERFORMED. Location of dredging.. Rate of advance per hour. Per day. 794 square feet 65 square feet. $46,560.97 1 2,432 square feet.. 54.83 square feet.. Cincinnati, Ohio, first.. Lower Ohio River.. 3 feet.. 8 feet... Springfield Boiler & Manufactur ing Co. About 2 years. Steel. $100,479.79. $3,000 (approximate). 192 feet. 44 feet. 7 feet. 2, 22-inch cylinder, 6-foot stroke, Mississippi River, side wheel. 2, 16 and 26 by 20 inches, horizontal tandem compound, con densing. 7 Mississippi River. 30 feet. 44 inches. 3,769 square feet. 157.5 square feet. Sand, gravel, with some bowl- Sand, gravel, lignite, and blue ders and loose rock. 10 to 20 feet. 238 cubic yards.. |