Page images
PDF
EPUB
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

Advantage of using tripod drills for unsound rock....
Use of tripod drills in obtaining a uniform mix.....

Use of tripod drills where rock contains pockets of clay-
The use of hammer drills_____

Arrangement of churn drill holes for multiple shots.
Arrangement of small drill holes for multiple shots..
Attitude of beds in relation to blasting_.

Advantage of flat-lying beds_-_

Difficulties encountered in steeply inclined beds___
Direction of quarry face for steeply inclined open beds_-

[merged small][ocr errors][merged small]
[ocr errors]

37

37

37

37

38

40

41

42

42

42

42

43

43

43

43

43

44

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]
[merged small][merged small][merged small][merged small][merged small][ocr errors][subsumed][merged small][merged small][merged small][merged small]

Use of different grades of explosives in same drill hole__

70

[blocks in formation]

Examples of shots in which detonating fuse was em-
ployed.

General considerations in blasting_.

87

91

Proper balance between explosive cost and drilling cost__
Proper balance between blasting efficiency and rock-load-
ing efficiency

[merged small][subsumed][ocr errors]

Proper balance between size of blast and size of steam
shovel___.

Secondary blasting_.

Definition of secondary blasting___.

Conditions governing the extent of secondary blasting___.
Methods of secondary blasting---.

Advantages of "block-holing" over

46

mud-capping" method_

[blocks in formation]

Method of block-hole blasting

95

Circumstances that justify the mud-capping method__.

Examples of excessive secondary blasting costs-_-_

Examples illustrating blasting efficiency_

Examples of quarry costs____

Blasting records____

Importance of keeping records___.

96

97

97

100

100

101

Examples of blasting records_.

Safety in blasting__.

102

106

[blocks in formation]

Desirability of changing from hand methods to steam-shovel
loading

120

Solution of difficulties in changing from hand-loading to
steam-shovel loading____.

120

[blocks in formation]
[blocks in formation]

Need of improved processes of mixing raw materials..
Mixing the materials in the quarry--.

Mixing processes in cement plants----
The three processes employed___.

Dry processes

Typical examples of dry processes_
Methods of overcoming fluctuations_
The best methods observed___.

The semiwet process...

Description of the process_

The advantages of the semiwet process_
Disadvantages of the semiwet process_.

Desirability of proper plant design___.
The storage bin as a mixing device__
Incomplete mixing in storage bin___
Summary of conclusions_.

Economic conditions----

Conditions governing plant location_.
Market

Transportation.

Fuel

139

140

140

140

141

141

142

142

144

144

145

145

146

146

147

148

148

148

149

149

149

[blocks in formation]

Publications that may be obtained only through the Superintendent of Documents

151

TABLES.

8

TABLE 1 Total recorded production of principal hydraulic cements in
the United States, 1818 to 1915, inclusive, in barrels_____.

2. Production, in barrels, and percentage of total output of Port-
land cement in the United States according to type of mate-
rial used, 1898-1914--

3.

Kind of rock, number, depth, and arrangement of churn drill
holes for typical multiple shots-----

4. Compositions of 40 per cent and 60 per cent "straight" nitro-
glycerin dynamites_.

[blocks in formation]
« PreviousContinue »